Wollongong (Gipps St)

PROJECT NAME

Wollongong (Gipps St)

PROJECT SIZE

5,623 m³

PROJECT STATUS

Completed

SCOPE OF WORKS

  • Site establishment, environmental controls and rainwater dewatering
  • Traffic control for First Civil truck movements only
  • Protection of existing stormwater pits, gutters and access points
  • Installation of sediment fencing, shaker grid and entry pad
  • Site clearance, vegetation removal and topsoil stripping
  • Bulk excavation in overburden, sandstone and hard materials
  • Offsite disposal of VENM and validated spoil
  • Detail excavation for pile caps, footings, lift pits, stair base and pump-out tank
  • Excavation and preparation works for crane base
  • Construction of shoring piles including reinforcement and concrete
  • Construction of foundation piles for building structure and crane base
  • Capping beam excavation, formwork, reinforcement and concrete works
  • Shotcrete wall installation with mesh reinforcement and surface finishing
  • Drilling, installation and stressing of temporary ground anchors
  • Supply and installation of struts and related temporary retention elements
  • Surveying, monitoring, QA documentation and construction records
  • Environmental, noise, vibration and dust controls throughout works