Wollongong (Gipps St)
PROJECT NAME
Wollongong (Gipps St)
PROJECT SIZE
5,623 m³
PROJECT STATUS
Completed
SCOPE OF WORKS
- Site establishment, environmental controls and rainwater dewatering
- Traffic control for First Civil truck movements only
- Protection of existing stormwater pits, gutters and access points
- Installation of sediment fencing, shaker grid and entry pad
- Site clearance, vegetation removal and topsoil stripping
- Bulk excavation in overburden, sandstone and hard materials
- Offsite disposal of VENM and validated spoil
- Detail excavation for pile caps, footings, lift pits, stair base and pump-out tank
- Excavation and preparation works for crane base
- Construction of shoring piles including reinforcement and concrete
- Construction of foundation piles for building structure and crane base
- Capping beam excavation, formwork, reinforcement and concrete works
- Shotcrete wall installation with mesh reinforcement and surface finishing
- Drilling, installation and stressing of temporary ground anchors
- Supply and installation of struts and related temporary retention elements
- Surveying, monitoring, QA documentation and construction records
- Environmental, noise, vibration and dust controls throughout works