SCOPE OF WORKS
- Site establishment and sediment control setup
- Traffic control and truck access management
- Demolition of existing slabs, shotcrete and footings
- Bulk excavation in sandstone and OTR materials
- Offsite disposal of VENM and ENM spoil
- Detail excavation for pad footings, lift pit and crane base
- Construction of CFA bored piles and testing
- Capping beam excavation, formwork and concrete works
- Installation of shotcrete walls with mesh reinforcement
- Drilling and installation of temporary and permanent anchors
- Installation of walers, struts and temporary props
- Survey, set-out and as-built documentation
- Environmental and safety management throughout works
- Final trimming, QA testing and site clean-up