Homebush West

PROJECT NAME

Homebush West

PROJECT SIZE

6,700 m³

PROJECT STATUS

Completed

SCOPE OF WORKS

  • Site establishment, environmental controls and rainwater dewatering
  • Traffic control for First Civil truck movements only
  • Protection of existing stormwater pits, gutters and access points
  • Installation of sediment fencing, shaker grid and stabilised access
  • Demolition of existing fibro cottages
  • Site clearance, vegetation removal and topsoil stripping
  • Bulk excavation in overburden, shale and hard materials
  • Offsite disposal of VENM and validated spoil
  • Detail excavation for pad footings, strip footings, lift pit and pump-out pit
  • Construction of bored piles including reinforcement and concrete
  • Piling spoil removal and concrete testing
  • Capping beam excavation, formwork, reinforcement and concrete works
  • Supply and installation of shotcrete walls with mesh reinforcement
  • Trimming, dowelling and finishing of shotcrete surfaces
  • Drilling, installation and stressing of temporary ground anchors
  • Supply and installation of walers and struts for temporary retention
  • Surveying, QA documentation and construction records
  • Environmental, noise, vibration and dust controls throughout works

PROJECT GALLERY