Homebush West
PROJECT NAME
Homebush West
PROJECT SIZE
6,700 m³
PROJECT STATUS
Completed
SCOPE OF WORKS
- Site establishment, environmental controls and rainwater dewatering
- Traffic control for First Civil truck movements only
- Protection of existing stormwater pits, gutters and access points
- Installation of sediment fencing, shaker grid and stabilised access
- Demolition of existing fibro cottages
- Site clearance, vegetation removal and topsoil stripping
- Bulk excavation in overburden, shale and hard materials
- Offsite disposal of VENM and validated spoil
- Detail excavation for pad footings, strip footings, lift pit and pump-out pit
- Construction of bored piles including reinforcement and concrete
- Piling spoil removal and concrete testing
- Capping beam excavation, formwork, reinforcement and concrete works
- Supply and installation of shotcrete walls with mesh reinforcement
- Trimming, dowelling and finishing of shotcrete surfaces
- Drilling, installation and stressing of temporary ground anchors
- Supply and installation of walers and struts for temporary retention
- Surveying, QA documentation and construction records
- Environmental, noise, vibration and dust controls throughout works