PROJECT NAME

Five Dock

PROJECT SIZE

20,548 m³

PROJECT STATUS

Ongoing

SCOPE OF WORKS

  • Site establishment and environmental controls
  • Demolition of existing brick structures and pavements
  • Bulk and detailed excavation to basement level
  • Offsite disposal of VENM and validated spoil
  • Dewatering and site water management
  • Construction of CFA bored piles and capping beam
  • Shotcrete walls and temporary retention systems
  • Installation of walers, struts and pad footings
  • Anchor drilling and stressing to design load
  • Noise, dust and vibration control measures
  • Plant, labour and supervision for all works

PROJECT GALLERY